26 Apr WESSEX WATER – DURLEIGH WTW GAC PLANT
TURNKEY
PIPEWORK, ACCESS METALWORK & INSTALLATION
CONTRACT VALUE £1.0M
“Powerrun have been a key supplier for our pipework and metalwork design, fabrication and installation in the Main Treatment Building on the Durleigh Water Treatment Centre Refurbishment project. They have continuously set a high standard of quality and performance. I was impressed by the level of commitment and flexibility to ensure our project was delivered on time, to budget and specification, whilst adhering to stringent health and safety requirements.”
Matthew Foyle MSc BEng IEng MIET
M&E Snr Project Manager